How Long Does It Take to Fit a New Kitchen? A Step-by-Step Guide

How Long Does It Take to Fit a New Kitchen

Renovating a kitchen is a big undertaking, filled with mess, stress, and intense work. It’s one of the most important rooms in your house, where daily action unfolds. While the process might seem daunting, setting firm timeframes helps you see the light at the end of the tunnel. Understanding the stages of renovation and how long you can expect the fitting to take is crucial for managing this significant undertaking efficiently.

An In-depth Look Into How Long Does It Take To Fit A Kitchen?

An In-depth Look into How long does it take to fit a kitchen

When considering the installation of a new kitchen, the role of a reputable kitchen fitter cannot be overstated. They should conduct a Pre-fit survey and a Non-obtrusive survey of the existing kitchen space. This includes checking the condition of walls, electrics, plumbing, and gas supplies, which greatly influence the fit duration.

It’s essential to set a reasonable expectation for the project’s timeframe, considering factors like the removal of furniture, repair or replaster of walls, and drying time for plastering. For older buildings, there might be unforeseen areas that impact the fitting process, possibly exceeding the expected timeline. Cabinets and their effective integration are dependent on these factors.

Start date planning is crucial, but always make a provision for potential over-run due to unforeseen circumstances. Being patient and maintaining control over the project is key. Seek professional advice, especially regarding electrical and gas works, which are complex components built into the equation of your kitchen fitting.

The making good phase, which includes plastering, flooring, and installing self-levelling compounds for a new floor, is integral. The removal of tiled flooring and the choice of materials, whether budget options or higher-end ones like travertine, mosaic, or porcelain floor tiles, can affect the duration.

Wall tiling and creating socket cut outs are also factors, with hot weather and high temperatures potentially impacting the process.

Planning

Planning

At the planning stage, understanding the size and shape of your kitchen is critical. The extent of the changes you’re considering plays a key role. Whether you’re contemplating a simple layout change or replacing all the units, spend time browsing through showrooms and selecting features that resonate with your vision. If you’re thinking about a significant change in the layout, keep in mind that this might affect the features and spec of your kitchen.

Research is a cornerstone of effective kitchen renovation. Look for high quality fitters or a contractor who can bring your ideas to life. If you’re uncertain about any aspect, don’t hesitate to consult a professional. They can help design your space and suggest the best fitting options.

Being decisive during the planning stage is essential, especially when it comes to replacing units or changing the layout. Your choices will influence both the shape and functionality of your kitchen.

In the world of kitchen renovations, your planning is as important as the execution. Take your time to browse and select the right features and layout, ensuring that the extent of changes aligns with your kitchen’s size and shape.

Remember, the fitting options and design you choose at this stage will dictate the entire course of your renovation, impacting everything from the layout to the spec of your kitchen.

Delivery

Once you have chosen and ordered your new kitchen, it’s crucial to allow sufficient time for it to be delivered. For standard kitchens, the wait time is typically 2-4 weeks. However, if you opt for a bespoke solution, anticipate a longer period. It’s important to confirm the delivery timeframe with your kitchen supplier as soon as you order. This allows you to effectively book your kitchen fitters in advance, ensuring they are available when your kitchen arrives.

The delivery of your kitchen is a pivotal moment in the fitting process. For standard kitchens, the 2-4 weeks waiting period is a general guideline, but for those who have opted for a bespoke solution, the timeline might extend further. Make sure to stay in constant communication with your kitchen supplier to confirm the expected delivery timeframe. This foresight enables you to book your kitchen fitters well in advance, aligning their availability with the delivery of your new kitchen.

Removal

Fitting a new kitchen is a journey that starts not with the new, but with the removal of the old kitchen. As a professional in the field, I’ve seen this process vary greatly in duration, often hinging on the complexity of the task at hand. Ripping out the old fittings can be a surprisingly intricate task, especially when it comes to flooring. It’s not just about pulling things out; it often involves delicate work to ensure the space is ready for what comes next.

Choosing the right contractor is crucial, as an experienced team can dismantle an old kitchen in just a few hours. However, this timeframe can extend if the fitting job involves extra work. For instance, starting with knocking down walls can significantly add to the time it takes to complete the job. Such structural changes are often undertaken to create a more open-plan space, a popular trend in modern kitchen designs.

First Fix

In the process of fitting a new kitchen, the first fix phase is where the groundwork for all the utilities is laid out. This step typically involves a skilled electrician and plumber working in tandem. They check the existing systems, ensuring that the wiring and plumbing are up to standard for the upcoming changes. It’s essential for them to install the necessary infrastructure for new fittings, like the sink and appliances. The positioning of these elements can make or break the functionality of your kitchen. While this phase doesn’t bring about huge changes in appearance, it’s crucial for the seamless operation of the kitchen. Generally, this 2-3 days long endeavor sets the stage for the more visually transformative stages that follow.

Fitting

Now, let’s dive into the fitting process. The groundwork is now behind us, and it’s time to watch our kitchen transform. The installation kicks off with cabinets and worktops, setting the stage for the kitchen’s new look. In my experience, this phase moves along swiftly. For a standard-sized kitchen, you’re looking at about 3-5 days to get the majority of the work done. Smaller kitchens? Even quicker.

Then comes the detail work – sinks and hobs. These elements are vital, but thankfully, they slot into place fairly seamlessly once the main structures are up. A pro tip from my own kitchen remodel: stay flexible with your timeline expectations. Every kitchen has its quirks.

Now, if you’ve opted for solid worktops like granite or Corian, brace yourself for a bit more time. These materials need templating. This process is crucial for a perfect fit and involves creating a precise template of your kitchen layout. Expect around 10 days for templating and fitting these countertops. Remember, templating happens on-site after all units are installed to ensure complete accuracy.

This extra step might stretch out the timeline, but it’s a trade-off for precision and quality. And a little insider knowledge – don’t hesitate to ask your installer for temporary countertops. It’s a small ask that can make your kitchen functional while you wait for those perfect worktops.

So, wrapping up, the kitchen fitting journey is a blend of efficiency and attention to detail. From quick installations to meticulous templating, every step plays a part in creating your dream kitchen. Remember, a little patience goes a long way in achieving that perfect fit.

Ready To Get Started With New Kitchen Cabinets?

Ready to Get Started with New Kitchen Cabinets

Embarking on the journey of fitting a new kitchen, especially when it comes to new cabinets, is an adventure in itself. From personal experience, I’ve learned that the entire process, from conception to completion, generally spans 4 to 6 months. This timeline might seem extensive, but it encompasses everything from initial design consultations to the final touches.

Now, focusing on the actual installation, it’s a relatively swift phase. On average, you’re looking at about 10 days. It’s a brief period where your kitchen transforms, evolving from the old to the new. Yes, a kitchen remodel might disrupt your daily routine temporarily, but the outcome is invariably rewarding. Imagine stepping into a kitchen that not only meets your aesthetic preferences but also elevates your culinary experiences.

As for those outdated, low-functioning cabinets, it’s time for an upgrade. Trusting a reliable company like Puustelli for your custom cabinet design can make all the difference. They understand the intricacies of kitchen dynamics and can transform your space into a functional, stylish, and inviting area. The investment of time and resources into this project is a testament to your commitment to quality living. Remember, the journey to a new kitchen is as much about the process as it is about the final product.

How Long Does It Take To Install Kitchen Cabinets? 4 Impactful Factors

How Long Does It Take To Install Kitchen Cabinets

When it comes to fitting a new kitchen, the installation of new kitchen cabinets is a critical phase, typically taking 5 to 7 days when handled by a professional contractor. However, if you’re integrating these with new countertops or undertaking a full remodel, the process can extend up to 14 days or more. While this is the average, several factors can influence this timeframe. These factors include the complexity of the cabinet design, the readiness of the installation site, and the efficiency of the workforce. Each of these elements plays a significant role in determining how quickly your kitchen can transition from the old to the new, with every detail from the initial design to the final installation impacting the overall timeline. So, patience and careful planning are key in ensuring a smooth and successful kitchen transformation.

1) Kitchen Size

Kitchen Size

One key factor in determining how long it takes to fit a new kitchen is the size of your kitchen. It’s quite straightforward – the larger your kitchen, the more time it will take to install cabinets and complete the overall setup. In smaller kitchens, you might be looking at a quick turnaround of just 1–2 days for cabinet replacement. However, for larger spaces, the process can stretch to 14 days or more. This variance in time is because larger kitchens not only have more cabinets to install but also require more intricate work in fitting and aligning each piece. So, when planning your kitchen remodel, always consider the size as a crucial factor in your timeline estimation, as it directly impacts the installation process from start to finish.

2) Number Of Cabinets

Interior Kitchen Creation

Another aspect that plays a crucial role in determining the duration of your kitchen fitting is the number of cabinets. Typically, when embarking on a kitchen remodel, the desire for more storage space and a better layout leads to an increase in the number of cabinets and drawers. This is especially true if you’re adding features like a functional kitchen island.

However, it’s interesting to note that unless there’s a significant increase in the number of cabinets compared to your current kitchen, the impact on the installation timeline is often minimal – maybe just a few additional hours or at most an extra day. This is because professional installers can efficiently handle multiple cabinets within a well-organized schedule. So, while the number of cabinets is a factor in the fitting process, its impact on the overall timeline is usually proportionate and manageable, ensuring that your dream kitchen takes shape without significant delays.

3) Incorporating Specialty Cabinetry Features

Incorporating Specialty Cabinetry Features

In the realm of kitchen remodeling, the introduction of specialty cabinetry features can significantly elevate both the functionality and aesthetic of your space. At Puustelli, we specialize in infusing these unique elements into cabinet designs, ensuring that each kitchen is tailor-made to fit the homeowner’s lifestyle. These specialized features can include vertical lift cabinets, Power Slide “lazy Susan” corner cabinets, and integrated cooktops with side knobs. Furthermore, adding pull-out cutting boards, paneled appliances for a seamless integration of dishwashers, refrigerators, and beverage coolers, as well as ovens and microwaves built into wall cabinetry, can transform your kitchen into a state-of-the-art space.

Incorporating these advanced features does mean a bit more time is required for installation. The complexity of integrating these elements with precision and care naturally extends the installation period. However, the time added is usually justifiable for the remarkable and highly functional end result. In my professional experience, homeowners find that the additional days spent are a worthwhile investment for the unparalleled convenience and elegance these features bring to their newly remodeled kitchen.

4) Changing The Design

Changing The Design

In the realm of kitchen renovations, custom cabinetry stands as a testament to personalized style. However, it’s important to remember that any design changes can significantly impact your timeline. Deciding to scrap an existing plan in favor of something new is not just about embracing creativity; it involves a complex dance of ordering new materials, drafting blueprints, and sometimes, reversing progress. This decision, while potentially elevating the end result, almost invariably leads to delays. The key is to finalize your design well in advance of the installation date to avoid such setbacks.

Installation Schedule For New Custom Kitchen Cabinets

Installation Schedule For New Custom Kitchen Cabinets

When opting for a customized kitchen, especially with firms specializing in custom kitchen cabinetry like Puustelli, the journey is both intricate and rewarding. This path to your dream kitchen is not a sprint but a marathon. From the initial consultation to the final installation, the entire process of acquiring brand new kitchen cabinets typically spans 4 to 6 months. This timeline encompasses various stages, including design approvals, material selection, and meticulous craftsmanship. Such a schedule ensures that every detail is tailored to your preferences, culminating in a kitchen that’s not just new but uniquely yours.

Step 1: Talk To A Designer

Talk to a Designer

The journey towards fitting a new kitchen begins with a simple call or email to a custom cabinet designer. This initial step is crucial for setting the foundation of what will become your dream kitchen. It’s about making that first contact and expressing your desire for brand new cabinets. This interaction sets the stage for a more detailed and personalized discussion about your kitchen aspirations.

Once you’ve established communication with your chosen designer, the next step is to schedule a free showroom consultation. This is where the exciting part of the kitchen design process starts to take shape. Preparing for this consultation is key. Spend time reflecting on the design you envision. Collect inspiration photos, and if available, bring along any blueprints or architectural renderings. These materials will give your designer a clear understanding of your vision and preferences.

The consultation itself, whether in-person or virtual, is a time to dive deep into your kitchen dreams. If you opt for an in-person visit to the showroom, you gain the added benefit of experiencing the materials firsthand. You can touch and feel different surfaces, explore various cabinet layouts, and gather ideas that could be incorporated into your own kitchen. This tactile experience often provides insights and inspirations that virtual meetings might not fully capture.

Embarking on this first step with your designer not only kickstarts the practical aspects of kitchen fitting but also ignites the creative process. It’s a collaborative venture where your ideas and the designer’s expertise merge to create a blueprint for your future kitchen.

Step 2: Gather Measurements

Gather Measurements

The next vital step in fitting a new kitchen with a company like Puustelli is to schedule a home visit for the designer. This visit is crucial for gathering measurements and documenting the kitchen space. Such meticulous attention to detail ensures that every aspect of the kitchen, down to the minutest element, is accounted for in the design. If you already possess measurements from an architect or contractor, these can be incredibly useful. In fact, designers can efficiently leverage 3D renderings or architectural blueprints to accurately plan and visualize the space, aligning closely with your expectations and the physical realities of your kitchen area.

Step 3: Collaborate On Kitchen Design

Collaborate on Kitchen Design

With the measurements finalized, the next critical phase in fitting a new kitchen is collaborating on the kitchen design. Your designer will craft a 3D design, which serves as a virtual blueprint for your kitchen. This stage is where your vision begins to take tangible form. You and your designer will work closely to select every detail that will define your kitchen’s character. From choosing the cabinet face styles and finalizing the overall kitchen configuration, to deciding on countertop materials, colors, and cabinet hardware, every element is carefully considered and selected to align with your aesthetic and functional desires. This collaborative process ensures that the final design is not only visually appealing but also a true reflection of your personal style and needs.

Step 4: Order Kitchen Cabinets

After reaching a consensus on the design, the next step is for your designer to prepare your designs for ordering and production. This phase is formalized with the signing of a contract, after which your custom kitchen cabinetry and countertop order will be officially placed. This marks the beginning of the manufacturing process, a crucial juncture in the journey of bringing your dream kitchen to life.

The construction of custom cabinetry typically spans 8–12 weeks. During this period, it’s advisable to order new appliances if they are part of your kitchen overhaul. If the remodeling process hasn’t started yet, this timeframe is optimal for removing old cabinetry and updating essential aspects like wiring, plumbing, drywall, and flooring. If you are collaborating with a contractor and/or architect, they might have initiated these steps already. They will provide a detailed timeline for these tasks, ensuring that the installation of your new cabinetry aligns seamlessly with the other ongoing renovations, ultimately shaping your kitchen into the envisioned masterpiece.

Step 5: Schedule An Installation Date + Watch The Magic Happen

As your cabinet order gets confirmed, the excitement builds up to the next big step – scheduling an installation date. This is where you and your designer pinpoint the day your new kitchen starts to materialize. Working with a reputable company like Puustelli ensures this process is smooth and efficient, with professionals guiding you every step of the way.

On the installation date, a certified Puustelli installer will arrive to transform your kitchen space. The installation of Puustelli cabinetry is a swift and streamlined process, typically completed within 10 days. If you’ve also opted for a countertop along with your cabinets, it gets installed simultaneously. This efficient approach can shave 2-4 weeks off the usual installation time, making the transition to your new kitchen quicker and less disruptive.

In scenarios involving a remodel of an existing kitchen or the fitting of a kitchen in a new home, the installation is meticulously timed. The cabinets are fitted by a certified professional contractor only after all plumbing and electric work is finished, and the floors and walls are ready. This ensures that the cabinetry installation is harmonious with the overall structure and design of the kitchen.

The total kitchen renovation process usually includes several stages:

  • Removing old cabinetry to make way for the new.
  • Marking electrical outlets for optimal appliance placement.
  • Undertaking necessary wiring, plumbing, drywall, and flooring work.
  • Installing new cabinets, the heart of your kitchen’s transformation.
  • Adding appliances & countertops, the functional and aesthetic elements.
  • Final touchups to ensure everything is perfect.

This structured approach to kitchen fitting allows for a seamless transition from the old to the new, ensuring that the end result is not just a new kitchen, but a space where memories will be made and cherished.

Step 6: Complete A Final Inspection

Complete a Final Inspection

 

The culminating phase of fitting your new kitchen is the Final Inspection. After the cabinets, hardware, and countertops have been meticulously installed, your certified installer conducts a thorough inspection. This crucial step is all about ensuring every element aligns perfectly with your approved design. It’s not just about checking the functionality but also about confirming that your kitchen is ready for use, everything is clean, and the space reflects the aesthetic you envisioned. This final review is the gateway to enjoying your brand new kitchen cabinets and the transformed space they inhabit, marking the completion of a journey from concept to reality.

Why You Should Choose Custom Cabinets Over Stock Cabinets

Why You Should Choose Custom Cabinets Over Stock Cabinets

Deciding between custom cabinets and stock options is a significant part of planning your kitchen renovation. It’s true, custom cabinets like those from Puustelli can take 10 to 14 weeks to build and deliver, which might seem extensive compared to the near-immediate availability of stock cabinets from big-box retailers. However, this longer wait comes with considerable advantages.

Stock cabinets might be tempting due to their quick availability, but they have several downsides. These cabinets are often made from medium-density fiberboard (MDF), which can release harmful formaldehyde into your home. Moreover, their construction involves cheaper, less durable materials. The mass-produced nature of stock cabinets means you’re likely to have the same kitchen design as many others, with no room for personalization. They also limit your ability to tailor the kitchen layout to your specific needs due to their prefabricated designs and sizes.

On the other hand, opting for custom cabinetry like Puustelli’s eco-luxury range means a wait that’s ultimately rewarding. These cabinets are free from MDF and chipboard, do not use formaldehyde-based glues, and avoid the use of endangered wood species. Their biocomposite frames are 100% recyclable and reusable, aligning with environmental consciousness.

The slightly longer wait for custom cabinets is a small price to pay for a kitchen that’s tailored to your lifestyle and design preferences. Whether you’re building a new home or remodeling your existing kitchen, custom cabinets offer unparalleled personalization and quality. This commitment to customization, quality, and sustainability makes them a superior choice for those who want their kitchen to be not just a cooking space, but a reflection of their values and aesthetics.

The Last Finishing Touches

The Last Finishing Touches

After the main components like kitchen units and countertops are in place, it’s time for the Finishing Touches. This final phase involves fitting your chosen flooring and attending to the finer details that bring the entire design together. These include the installation of plinthing, skirting boards, splashbacks, and any additional redecorating touches that personalize the space. It’s these elements that transform a functional kitchen into a space that truly feels like your own.

Typically, the scope of these finishing elements dictates their completion time. If it’s about extra changes, they usually wrap up within a few days. For instance, painting your kitchen might be a do-it-yourself project that takes a day or two, adding a fresh, personal feel to the space. Meanwhile, if you’re opting for tiles, this requires a separate arrangement with a tiler for precise and professional installation. These finishing steps, though seemingly small, play a significant role in enhancing the aesthetics and functionality of your newly fitted kitchen.

What Could Extend My Fitting Time?

What Could Extend My Fitting Time

Several factors can extend the fitting time of your new kitchen, and it’s essential to consider these from the start, especially if you’re working on a tight schedule. Changes such as altering the initial design, opting for custom cabinetry over stock options, or deciding on unique materials or finishes can add significant time to the project. Additionally, unexpected structural challenges or delays in receiving materials can also prolong the process. It’s crucial to maintain flexibility and open communication with your designer and contractors to navigate these potential time extenders effectively.

Moving Appliances

The task of Moving Appliances during a kitchen fitting can significantly impact both the timeline and budget. If your plan allows electrical outlets to remain in their current locations, the work required is relatively minimal, typically involving just a check and possible rewire of these existing points. However, if your new kitchen layout necessitates relocating appliances, an electrician will need to adjust or entirely overhaul your kitchen’s electrical system. This not only adds complexity to the project but also extends the time and increases costs. Planning the placement of appliances in coordination with your kitchen’s electrical setup is crucial to avoid unexpected delays and expenses.

Solid Worktops

Choosing Solid Worktops for your kitchen can add to the overall fitting time. These types of worktops, known for their durability and aesthetic appeal, require a specific process called templating. This involves precise measurement and cutting on site to ensure they fit perfectly with your kitchen units. Consequently, if you opt for solid worktops, be prepared for a longer wait after your units have been fitted, as this additional step takes extra time to complete. The result, however, is a seamlessly integrated and custom-fitted worktop that enhances the beauty and functionality of your kitchen.

Heavy Worktops

Opting for Heavy Worktops made of materials like granite introduces additional considerations into the kitchen fitting process. These substantial materials require not only careful handling but also assurance that your kitchen units are structurally capable of supporting their weight over an extended period. Consequently, it becomes necessary to engage a specialist installer. This expert will assess the requirements and install any additional support needed to safely accommodate the heavy worktops. This step, while crucial for ensuring the longevity and safety of your kitchen, may extend the overall timeline of the fitting process.

Unusual Fittings

Incorporating Unusual Fittings into your kitchen design can significantly affect the fitting time. While installing straight worktops is relatively straightforward, complexities arise when the worktop needs to navigate around fixtures like the sink and hob or accommodate unique design features such as curves or corners. These intricate details require additional precision and time for proper installation. Although such design elements might be essential to achieving your desired kitchen aesthetic, it’s important to recognize that they will extend the overall timeline of your kitchen fitting project.

People Also Ask

How Long Does It Take To Install A Fitted Kitchen?

When embarking on the journey of fitting a new kitchen, the initial steps lay the groundwork for a transformation that unfolds surprisingly quickly. The fitting process, a blend of skill and artistry, begins with the cabinets and worktops. These foundational elements are fitted first, setting the stage for the kitchen to take shape.

Next comes the installation of the sink and hob, critical components that dictate the kitchen’s functionality. The majority of the work, in my experience, is completed within 3-5 days. However, this timeframe can vary. A small kitchen often requires less time, due to its compact nature.

What stands out in this process is how each step, from the initial fitting to the final touch, contributes to a kitchen that’s both practical and inviting. It’s a meticulous journey where every detail, big or small, comes together to create a space that’s uniquely yours.

Is It Hard To Fit A New Kitchen?

The task of fitting a kitchen can seem daunting at first, especially for a complete novice. However, it’s perfectly possible for someone with even a modest level of DIY skills to take on this challenge themselves. The key lies in the approach: it’s not just about having the skills but also about being happy to take the necessary time and put in careful preparation.

When approached properly, fitting a kitchen can be a straightforward process. It requires patience, precision, and a willingness to learn. With the right mindset and a bit of elbow grease, transforming a kitchen space can become an achievable and rewarding DIY project.

How Long Does It Take To Install New Kitchen Cabinets And Countertops?

When considering the timeline for a kitchen renovation, the installation of cabinets and countertops plays a pivotal role. Cabinet installation is typically a swift process, normally taking two to three days. This phase often sets the pace for the entire project. The countertops, however, require a bit more patience. From creating the initial template to the actual installation, this can take an additional few weeks.

It’s essential to factor in these timeframes when planning your kitchen makeover. While some stages, like the cabinet installation, can be surprisingly quick, others, such as countertop fitting, might present problems if rushed. It’s like playing a well-orchestrated video—each step must be timed perfectly to ensure a smooth and successful kitchen transformation.

What Are The Stages Of Fitting A Kitchen?

Fitting a new kitchen is a journey through various stages, each integral to the overall process. It starts with 1 – removing the existing setup of the room. Then, 2 – routing new services like gas and electricity is crucial. 3 sees the plastering of walls, preparing them for cabinetry. 4 involves setting up the lighting, which is essential for both functionality and ambiance.

5 – Laying the flooring sets the stage for 6 – the fitting of cabinets and appliances. 7 is all about installing the worktops, a defining feature of any kitchen. Finally, 9 concludes with the essential electrical and plumbing connections, tying all the elements together into a cohesive and functional kitchen space.

Navigating through these stages requires patience and precision, and the timeframe can vary greatly depending on the complexity and size of the kitchen.